![Bellway books £30m for structural issue at London block](https://dailytalks.org/wp-content/uploads/2023/10/113283-bellway-books-30m-for-structural-issue-at-london-block.jpg)
Bellway has set aside £30.5m to resolve a structural building-safety issue at a 12-year-old London housing block – and said it is investigating whether similar issues exist with other buildings. In the company’s preliminary results for the year to 31 July, it set aside £49.6m…
The post Bellway books £30m for structural issue at London block appeared first on Construction News…
Read More