![HS2 launches third TBM after underground construction](https://dailytalks.org/wp-content/uploads/2024/04/152790-hs2-launches-third-tbm-after-underground-construction.jpg)
HS2 has launched its third tunnel boring machine (TBM), which will drill 3.4 miles under London. The TBM, known as Emily, will cover the route between the Victoria Road Crossover Box, near Old Oak Common, to Greenpark Way in Greenford. Emily is the third of…
The post HS2 launches third TBM after underground construction appeared first on Construction News…
Read More